We help the world growing since 1983

Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our commission would be to serve our customers and clientele with very best excellent and aggressive portable digital products for Customized Precision Machinining Parts, Abfälle Shredder Teile, Mâchoire de carrière de pierre, Our company maintains safe business mixed by truth and honesty to keep long-term relationships with our customers.
Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY Detail:

TRACK SHOES

HCMP foundry supplies manganese and alloy track shoes for a range of hydraulic excavators and shovels.

Manganese steel:  ASTM128 Grade E1 (Mn13Mo1)…etc , we could cast according to customer enquiry material .

Alloy steel: Germany standard:GS34CrMoV5 and GS30CrMoNi4 , AISI4320( Chinese standard G20CrNi2Mo) …etc , We could cast according to customer enquiry material.

Our alloy track shoes undergo secondary induction hardening on the tread surface and drive lugs to ensure maximum wear life .

The replacement parts model :

Brand

 Model

Material

Part No.

QTY(PCS)/SET

Drawing (Y/N)

HITACHI

EX2500

ASTM128 E1 (Mo >1.2)

0004092

78

YES

EX3500/3600

ASTM128 E1 (Mo >1.2)

0003599

76

YES

EX5500/5600

ASTM128 E1 (Mo >1.2)

0002944(0004093)

78

YES

 

 

 

 

 

 

KOMATSU

PC3000

ASTM128 E1(Mo>1.2)/ALLOY

887-140-40

92

YES

ALLOY

921-181-40

92

YES

PC3000-6

ALLOY

921-189-40

92

NO

PC4000

ASTM128 E1(Mo>1.2)/ALLOY

887-114-40

94

YES

PC4000-6

ASTM128 E1(Mo>1.2)/ALLOY

887-116-40

98

NO

PC5500

ASTM128 E1(Mo>1.2)/ALLOY

675-813-40

92

YES

ASTM128 E1(Mo>1.2)/ALLOY

675-813-40-1500

92

YES

PC8000

ASTM128 E1(Mo>1.2)/ALLOY

620-018-40

96

YES

PC8000-6

ASTM128 E1(Mo>1.2)/ALLOY

936-695-40

96

YES

 

 

 

 

 

 

O&K

RH120E

ALLOY

 

94

NO

ALLOY

3674039

94

YES

ALLOY

 

94

NO

RH170

ALLOY

2415548

84

YES

ALLOY

2711222

84

NO

ALLOY

2707496

84

NO

RH200/340

ALLOY

2418986

78/84

YES

 

 

 

 

 

 

P&H

PH4100XPC
Electric rope Shovels

     

YES


Product detail pictures:

Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY detail pictures

Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY detail pictures

Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY detail pictures


Related Product Guide:
How Industrial Supplies Are Used in Manufacturing
Reasons to Work in the Mining Industry

The business keeps to the operation concept scientific management, premium quality and efficiency primacy, customer supreme for Short Lead Time for Earth Auger Hole Digger - Track Pad&Crawler Shoes – HAOCHENG MACHINERY, The product will supply to all over the world, such as: Poland, Nigeria, Puerto Rico, We now have to continue to uphold the quality, detailed, efficient business philosophy of honest, responsible, innovativespirit of service, abide by the contract and abide by reputation, first-class goods and improve service welcome overseas customers patrons.
  • The customer service staff's attitude is very sincere and the reply is timely and very detailed, this is very helpful for our deal,thank you.
    5 Stars By Doreen from Slovenia - 2018.09.08 17:09
    The accounts manager made a detailed introduction about the product, so that we have a comprehensive understanding of the product, and ultimately we decided to cooperate.
    5 Stars By Elva from Riyadh - 2018.09.21 11:01
    WhatsApp Online Chat !